FPSO Anna NeryFPSO Anna Nery








1/9
Project:项目: FPSO Anna NeryFPSO Anna Nery
Client:客户: Jord Oil & Gas Systems
Year:年份: 2020-2021
Simu Engineers Services:Simu Engineers 服务范围:
- • 3D modelling3D 建模
- • Piping supports管道支撑
- • Structural Design结构设计
- • Structural Analysis结构分析
- • Weight controls重量控制
- • Drawings图纸
- • Fabrication supervision and follow-up制造监造与跟进
Jord Oil & Gas systems bv is awarded by Yinson Production to provide Engineering, Procurement and Construction of 5 topside modules for has FPSO Anna Nery (“FPSO”) which will be installed at Marlim and Voador Field, offshore Brazil. Simu Engineers bv is providing complete structural engineering service for JORD and construction follow-ups. The total scope of work is approximately 7000mT for separation module, produced water treatment module, 2 x power generation module and closed drain module. The total amount of man hours for structural engineering is approximately 16,000 man hours. The engineering deliverables include in-place analysis, transport analysis, blast analysis, fatigue analysis and fire redundancy analysis. Drawing packages include 3D modelling, Primary steel drawings, Secondary steel drawings, tertiary steel drawings and temporary structure drawings.Yinson Production 授予 Jord Oil & Gas systems bv FPSO Anna Nery 五个上部模块的工程、采购与建造(EPC)合同,该 FPSO 将安装于巴西海上 Marlim 与 Voador 油田。Simu Engineers bv 为 JORD 提供完整的结构工程服务及施工跟进。工作范围总计约 7000 吨,包括分离模块、采出水处理模块、两个发电模块及闭式排放模块。结构工程总工时约 16,000 工时。工程交付物包括在位分析、运输分析、爆炸分析、疲劳分析与火灾冗余分析;图纸包包括 3D 建模、主结构图、次结构图、三级结构图及临时结构图。